written by Elliot.
For the past week we have been getting a gas line run to our house because natural gas is cheaper than propane.
 |
expert ditch digger. |
 |
digging up our front lawn. |
.
.
digging a ditch to our house to connect the gas to it.
|
and the gas company found so many rocks that they had to bring in a rock hammer and smash all the rock. |
 |
rock hammer. |
And then they had to cut out a strip of our driveway to get out all the rocks so that they would not crush the pipe.
 |
there was a lot of choking dust. |
 |
it was very hazy(hard to get a good picture). |
 |
digging it up. |
 |
halfway there. |
 |
nice chasm there.. |
And soon they will fill it up back with cement.
 |
now they are laying the pipe. |
 |
and now they are filling the driveway back up with cement. |
 |
a cement layer who knows what he is doing. |
 |
nice new strip. |
The cement has to dry for at least a week, so we will will have to drive on the grass to get out. |
It took them about two weeks for them to finish the job because of rain, and they had to wait for the right equipment.